
On Bridge Street most of the preparatory work for the traffic lights seems to have been done. Cables have been laid. The old bus stop has a red poster to say that it has been relocated. 
A new bus stop is in place lower down.

The workers have moved on to modify the disabled bays on Stert Street to add dropped kerbs for wheelchairs.