It was a hot day with temperatures up to 32°C. Not a cloud in the sky.
The hole in Bridge Street was filled in yesterday and tarmacked today, with the temporary traffic lights now removed – to the relief of drivers.
At Abbey Meadow, the open-air pool was brightened by sun umbrellas and people with beach towels.
Over by the splash pad, children ran screaming through the fountains of water
The town began to have a holiday feel.
How long before that tarmac comes up again? Patching is only ever temporary and is not a proper repair.
Nice to see people enjoying the pool.
ppjs … that’s not a road repair, it’s a temporary parking space in the centre of town.