Category Archives: Guildhall

Announcing Open Day for Abingdon Guildhall Improvement Project

Guildhall Plans
Abingdon on Thames Town Council are holding an Open Day about their latest plans for the Guildhall on Saturday 23th July 2016 . This is on the Abingdon Portal and on noticeboards round the town. So I thought I would also announce …

Let me tell you of the Guildhall
Its rooms for public use –
Some ancient and some modern
all fused without excuse.

One end has lots of concrete,
A nineteen sixties build
That doesn’t fit the heritage –
Of a hall for an ancient Guild.

New plans will be on display
that change the modern end
with a new glazed public piazza
to meet the latest trend.

The plans will also include the removal of the front external escape stair and front and rear concrete ramps. The main hall will have raked seating and cinematographic equipment, and a stage moved to the other end.

Guildhall Plans Submitted

Guildhall Plans Submitted
Two planning applications have been submitted for The Guildhall, Abingdon. The plans can be found on the Vale of White Horses planning portal: one is for listed building consent, the other is for full planning permission. A decision will be made mid May.

Various plans have been put forward since the Guildhall ownership transferred from the Vale of White Horse District Council to Abingdon Town Council six years ago. It is intended to make the 1960s Abbey hall more accessible – with multiple usage including a cinema. This final proposal includes the remodeling of the lower level space with the creation of a new glazed public entrance with a new cafe, and a patio area in front.

Guildhall Plans Submitted
The plan will also remove the front and the rear concrete ramps.

Abingdon-on-Thames Town Council Meeting – September 30th 2015 – Part 1

Abingdon-on-Thames Town Council Meetings
There was a meeting of Abingdon Town Council this evening.
Abingdon-on-Thames Town Council Meetings
There had been a meeting of the Guildhall Committee, back in July, that outlined plans for the Guildhall redevelopment. The final plans will be agreed in November. The Town Council heard about progress on these plans from the architect this evening.

The main points are that there will be a new transparent (glass) entrance at ground floor level, down to the left of the picture, into what is currently the old unused cloakroom area, and backstage. That entrance area will have a bar area with tables, a reception, and a community space. Opposite the new ground floor entrance, new stairs will be added, and the existing lift will be refurbished.

Where the big old stage is currently (left of building), there will be rooms on three levels including community spaces, and storage, accessible by stairs or lift.

The current Abbey Hall will be designed as an acoustic box to allow cinema or performances, that won’t disturb neighbours. It may have raked seating, and the new stage, and cinema screen, will be opposite where the stage is currently.

A new platform lift, at ground level, will access the older Guildhall rooms .
Abingdon-on-Thames Town Council Meetings
The Town Council are set to undertake a Neighborhood Plan for the Abingdon-on-Thames area and have drawn up new town boundaries. They include the Drayton Road development; and green belt areas in North Abingdon set for development in the Vale of White Horse District Council’s Local Plan. The red line also takes in an area, the other side of the A34, known as Abingdon Common.
Abingdon-on-Thames Town Council Meetings
Upcoming events announced by the Mayor at the meeting included:
* Abingdon Fair Service at 8pm on 4th October.
* Les, the Residents Parking Warden is retiring next week, and there will be a reception for him.
* Mayor’s Charity Quiz at Long Furlong Community Centre this year. 23rd October. Tickets are £15 with buffet. It raises funds for the Over 70’s Christmas Party,

To be Continued.

Abingdon Guildhall Project Changes Course

Project Guildhall Changes Course
A new Town Council have been voted in during May 2015. As happened four years ago the plans for the Guildhall have changed after the election.

In 2011 the outgoing council had proposed some quick wins to make the modern part of the Guildhall – the Abbey Hall – more usable:

  • Install a bar at the back of the Abbey Hall
  • Improve disability access and toilets
  • soften the look of the hall with designer drapes round the sides
  • modernise the kitchen
  • improve the problematic sound system.

After those quick wins they wanted to take time to consider how to invest the bulk of the £1.2m that had come with the Guildhall.

The incoming 2011 council hired new consultants. The first thing they did was spend money on refurbishing the old part of the building – the part where you might reasonably expect to get grants.

They then developed a new scheme for the Guildhall. It’s main points were:

  • Add a one screen cinema, as a new box construction, at the back
  • Install retractable seating for the Abbey Hall, so that it too could serve as a cinema or theatre, or as a dining or dance floor
  • A stylish new front to the building
  • Better access throughout.

The project was modular so that one part could be developed ahead of the others. However the full scheme failed to win lottery funding, and so the town council looked for investment from cinema operators to try to make the cinema part happen. The tenders came in just before the 2015 election.
Project Guildhall Changes Course

Yesterday’s press release
by the incoming 2015 council has gone for a less ambitious plan.

The three cinema companies that tendered to run the cinema, have not come up with enough money, and the new council does not want to take out a large loan. The tenders would also lead to loss of community space. I gather they thought the scheme was only viable with two screens. And so all three tenders were rejected.

Regarding the cinema, the Town Council will now ask the Leader of the Vale of White Horse to try to attract cinema operators to Abingdon. Hopefully they will ask for this to be into the town centre, and not out of town.

The new 2015 cut down plan, to be designed and built when the Guildhall closes at the end of August, is:

  • Abbey Hall improvements, including installing cinema projector equipment and screen, retractable seating and soundproofing
  • Creation of entry to the modern part of the Guildhall at street level
  • Access improvements across the whole building
  • Improve toilets
  • Replace boiler / heating system and relocate boiler room

The Abbey Hall could then be used as a pop-up cinema, but might also attract the likes of the Abingdon Operatic Society, and Abingdon Drama Club.

The council have also added into the project for a phase 2:

  • Kitchen Improvments
  • Install Wi-Fi and hearing loop in historic rooms
  • New carpeting

Project Guildhall Changes Course

  • Removal of access ramp to the rear so long as satisfactory disabled access and fire stategy agreed